欧美人妻精品一区二区三区99,中文字幕日韩精品内射,精品国产综合成人亚洲区,久久香蕉国产线熟妇人妻

Inspection of flange fasteners

1. ??? : ?? ?? ???? ??? ???? ???? ???? ???? ??? ??? ?????? ??????. ??? ???? ???? ? ????. ???? ?? ??? ???? ??? ??? ??? ??? ????? ??????.

2.Flange: check whether the flange face is damaged before installation, If scratches, nicks, mud, corrosion and burrs, dents and scratches passing through the water line of flange sealing surface in radial direction, and the depth of scratches is more than 0.2mm, and the covering surface is more than half of the width of gasket sealing surface, the flange must be replaced or the sealing surface must be reprocessed and repaired; the position of nut support surface on the back of flange should be parallel and smooth; check whether the flange is aligned, and the inspection method shall be in accordance with 6.2 of sh3501-2011 Pipeline installation requirements.

3.Bolt and nut: check whether the bolt and nut are used correctly according to the design requirements of equipment and pipeline; the thread and contact surface shall be free of dirt, rust, double skin, scratch, burr, debris and other external substances that affect the torque in the tightening process; it is not allowed to repair the bolt by welding or machining; at least two threads shall be exposed outside the nut after the flange is installed and tightened;

Bolts and nuts must be lubricated before use, so as to have low friction coefficient when tightening bolts and improve the anti sliding wire and anti-corrosion performance of bolts and nuts; stud thread, nut thread and contact surface must be degreased and dried before using lubricating oil; unified lubrication method shall be properly used for bolt thread, nut thread, nut bearing surface, washer and nut supporting surface on flange Lubricating oil; use high temperature anti seizing agent as required.

Bolt tightening method

No torque box spanner or hammer spanner: suitable for fastening flange of general equipment and pipeline, selected according to bolt size and flange pressure grade. The tightening requirements are as follows:

1. The maintenance unit formulates the fastening scheme, fastens the flange symmetrically, and numbers the fastening sequence. Refer to Fig. 1 and Fig. 2 for numbering.

2. Position the gasket with 4 bolts at the positions of 1, 2, 3 and 4 to ensure that the center of the spiral wound gasket is within the flange edge.

3. Tighten the positioning bolt by hand, then insert other stud bolts and balance the load by hand, so as to ensure that at least 2 threads are exposed at each end of the nut.

4. According to the on-site equipment and flange, the tightening times (at least 3 times) and the hammering load (strength) of each tightening should be reasonably determined according to the calculation of tightening one circle. The tightening hammering load (strength) should be tightened from small to large in turn (such as 50%, 80%, 100% increment). The load should not be too fast or too large to prevent gasket seal failure.

5. Tightening sequence of no torque box spanner or hammer spanner each time:

Tighten the two radially opposite bolts to the given hammering load (strength) of the bolts;

Fasten another pair of bolts about 90 degrees away from the previous two bolts along the circumference;

Continue tightening until all the remaining bolts are tightened to a given hammer load.

Finally, according to 100% hammering load (force), all bolts shall be tightened clockwise or counterclockwise.

Tightening technical requirements for installation process of equipment and pipeline flange 2
Tightening technical requirements for installation process of equipment and pipeline flange 3

Torque wrench: suitable for high temperature, high pressure, flammable and explosive equipment and pipe flange.

The tightening requirements are as follows:

1. The maintenance unit needs to formulate the fastening scheme, formulate the appropriate torque, and carry out the design review according to the bolt strength, the initial sealing pressure of the gasket, the working sealing pressure, the medium pressure and other parameters, so as to prevent the bolt from breaking and the gasket from losing its elasticity due to the excessive pressing force, resulting in the seal failure.

2. Fasten the flange symmetrically and number the tightening sequence. Refer to figure 1 and Figure 2 for numbering.

3. Position the gasket with 4 bolts at the positions of 1, 2, 3 and 4 to ensure that the center of the spiral wound gasket is within the flange edge.

4. Tighten the positioning bolt by hand, then insert other stud bolts and balance the load by hand, so as to ensure that at least 2 threads are exposed at each end of the nut.

5. According to the on-site equipment and flange, the tightening times (at least 3 times) and each tightening torque should be reasonably determined according to the calculation of tightening one circle. The tightening torque should be tightened from small to large in turn (such as 50%, 80%, 100% increment). The load should not be too fast or too large to prevent the gasket sealing failure.

6. Tightening sequence of torque wrench each time:

Tighten the two radially opposite bolts to the given bolt torque;

Fasten another pair of bolts about 90 degrees away from the previous two bolts along the circumference;

Continue tightening until all the remaining bolts are tightened to the specified torque.

7. Finally, tighten all bolts clockwise or counterclockwise according to 100% torque value.

8. Record the torque value for reference in future maintenance.

Bolt stretcher: suitable for high temperature, high pressure, flammable and explosive equipment and pipe flange.

The tightening requirements are as follows:

1. The maintenance unit formulates the fastening scheme, formulates the appropriate stretching force, and carries out the design review according to the bolt strength, the initial sealing specific pressure of the gasket, the working sealing specific pressure, the medium pressure and other parameters, so as to prevent the bolt from breaking and the gasket from losing its elasticity due to the excessive pressing force, resulting in the seal failure.

2. When the bolt stretcher single (step-by-step) stretches and fastens the bolt, it should follow the principle of bolt tightening uniformity and refer to the tightening sequence of torque wrench.

3. In the process of bolt stretching and fastening, the number of times of stretching and fastening should be reasonably determined. The pressure should be increased from small to large in turn (such as 50%, 80%, 100%), and evenly. Every time a certain pressure is increased, the pressure should be stabilized and then increased, so as to avoid excessive impact tension and affect the bolt pre tightening effect.

4. Record the pressurization value for reference in future maintenance.

?? ???

???? ???? ????. ?? ???? * ? ???? ????

免费久久一级欧美特大黄孕妇| 中文字幕91在线观看| 国产午夜在线精品视频| 色综合久久中文综合网| 国产成人高清精品尤物| 国产内射一级一片内射高清视频| 最新国产欧美精品91| 国产老女人性生活视频| 五月天婷亚洲天婷综合网| 日韩精品一级片免费看| 草草视频福利在线观看| 精品国产亚洲av久一区二区三区| 国产欧美日韩精品成人专区| 国语对白刺激高潮在线视频| 国产欧美一区二区色综合| 中文字幕精品人妻一区| 日本和亚洲的香蕉视频| 在线亚洲成人中文字幕高清| 国产韩国日本精品视频| 亚洲色图欧美另类人妻| 欧美成人黄色一区二区三区| 青青操视频在线观看国产| 91日韩在线观看你懂的| 国产精品人妻熟女毛片av久| 国产精品视频一区二区秋霞| 九九热精品视频免费在线播放| 国产专区亚洲专区久久| 午夜精品一区免费视频| 亚洲国产一区精品一区二区三区色| 久久午夜福利精品日韩| 国内精品伊人久久久av高清| 中文字幕日韩精品人一妻| 国产一区二区三区色噜噜| 男人的天堂的视频东京热| 日韩免费国产91在线| 久久99午夜福利视频| 国产99久久精品果冻传媒| 亚洲精品国产美女久久久99| 正在播放国产又粗又长| 欧美自拍偷自拍亚洲精品| 欧美视频在线观看一区|