Many customers complain that the service life of cemented carbide molds they buy is very short, and they often crack after less than oneortwo times of stamping. That’s because first of all, cemented carbide is a hard but brittle material, and special attention should be paid to the maintenance of cemented carbide molds in use. Secondly, customers usually haven’t considered these three aspects. Today we will share with you in an article how to extend the service life of your cemented carbide mold through these three points.

3 ASPECTS DETERMINE THE SERVICE LIFE OF YOUR CEMENTED CARBIDE MOLD 2

Have you selected cemented carbide molds with a good quality? ?

Quality includes the following:

1. It must have high resistance: the mold must accept great extrusion pressure, bending stress, impact and other messy loads at the same time during the extrusion process.

2. It must have very good wear resistance: the mold should have high wear resistance to ensure normal service life and produce a large number of qualified extrusions.

3. There must be sufficient thermal stability: during each continuous production, the temperature rise of the mold sometimes reaches or exceeds 200 ℃, which will reduce the strength and hardness of the mold material with 160~180 ℃ as the tempering temperature. Therefore, the mold material with higher temperature rise should have excellent tempering stability.

4. It must have outstanding technicality: the manufacturing cycle of cold extrusion die is long, the technology is messy, and the accuracy requirement is high. Generally, casting, cutting, heat treatment, grinding or other finish machining are required.

Do you use cemented carbide for production correctly?

When using cemented carbide dies, we should pay attention to the following points:

1. During the working process of the machine and equipment, the technician monitors the working condition of the equipment in real time to eliminate the machine faults in advance. Only in this way can we ensure the smooth progress of the whole production process.

2. The cemented carbide mold must be in a safe state before it is used and in the process of idle parking.

3. Cemented carbide dies belong to high maintenance rate equipment because of long-term load work. During maintenance, the machine should be firmly fixed with supports, the equipment should be shut down, and the whole set of equipment should be in a static state before starting the next step of maintenance work.

4. The gear oil in the cemented carbide mold is very irritating to the skin. When checking whether there is leakage, don’t touch it with your hands. If necessary, wear gloves or use paper to check, so as to avoid direct skin contact. Different cemented carbide molds need to be careful in the processing process, with safety as the main factor.

5. Select the appropriate reduction ratio. Cemented carbide die itself has the characteristics of hardness and brittleness. If it is used for shrinkage drawing with large area shrinkage, it is easy to cause the die to bear the stress and be broken and scrapped. Therefore, it is necessary to select the appropriate area shrinkage according to the different mechanical properties of wire rod.

3つの側(cè)面が超硬合金の耐用年數(shù)を決定します3

Do you regularly repair your cemented carbide mold?

Regular maintenance of cemented carbide dies is a major factor that can effectively improve the service life of cemented carbide dies.

For example, the installation and debugging method of the mold should be appropriate. In the case of hot runner, the power wiring should be correct, the cooling water path should meet the design requirements, the parameters of injection molding machine, die casting machine and press machine should meet the design requirements in the production of the mold, etc.

When using the mold correctly, it is also necessary to maintain the mold regularly. The guide post, guide sleeve and other parts with relative movement of the mold should be often filled with lubricating oil. For forging mold, plastic mold, die-casting mold and other molds, lubricant or molding agent should be sprayed on the surface of formed parts before each mold is formed.

The planned protective maintenance of the mold and the data processing in the maintenance process can prevent the problems that may occur in the production of the mold and improve the efficiency of maintenance work.

コメントを殘す

メールアドレスが公開されることはありません。 が付いている欄は必須項(xiàng)目です

几巴怪物操逼视频| 九九在线视频热线视频精选| 青娱乐极品视觉导航| 欧美一区二区三区高清性群p| 一区二中文字幕在线看国产一区| 国产成人精品区在线观看| 97精品人妻人人做人人爽| 亚洲综合色88综合天堂| 亚洲国产综合精品 在线 一区| 又爽又粗又大又长的爆草| 人妻波多野结衣爽到喷水| 国精品午夜福利视频导航| 成人精品视频区一区二区三| 国产 推油 性爱| 人妻少妇精品视频12p| 插插插插插插插插插插插| 国产女做a爱全免费视频| 欧美一区二区三区久久国产精品| 国产蜜月精品高清一区二区三区| 欧美精品第一区二区三区| A级毛片高清视频| 操大屌粉的小穴视频| 色狠狠久久av北条麻妃| 日本一区二区不卡在线国产| 亚洲欧美一区二区三区孕妇| 欠欠草免费在线视频| 日韩精品无码一区二区三区不卡| 日本不卡高清视频在线播放| 亚洲综合区欧美一区二区| 内射后入在线观看一区| 黄色视频网在线观看| 丁香社区五月在线视频久| 男女真人牲交高潮全过程| 欧美成人3p视频| 免费看澡美女逼视频看看| 呦交小u女国产精品99| AV无码超清破解版流出| 国产午夜福利视频第三区| 国产精品国产三级国| 操我骚逼抽插视频| 日本欧美人一区二区三区|